Operating instructions for rope pull switches rps, Setup – EUCHNER RPS User Manual
Page 11

Operating Instructions for Rope Pull
Switches RPS...
11
Connection example
The following connection example shows a possible circuit structure with redundant design at the cable level as
well.
The signals of the emergency stop chain are evaluated by a safety relay (ESM from EUCHNER).
The overall control concept into which the pull rope switch RPS is integrated must be evaluated by the end
consumer/machine designer in accordance with EN ISO 13849-2.
K1
RPS
21
22 .2
21
22 .2
24V
GND
24VDC
A1
A2
S11
S10
21
22
ESM-BA301
41
42
S13
EUCHNER
13
14
33
34
S21
EUCHNER
RPS3131SC...
.
S12
S14
13
14
23
24
33
34
41
42
GND
24V
PE
S3
S2
S1
K1B
K1A
K1
K2
K1A
K1B
23
24
23
24
23
24
21
22
21
22
+
+
A1
A2
A1
A2
Setup
Mechanical function test
It must be possible to actuate the pull rope easily at every point of the cabling rope pull system. As a check,
actuate the pull rope several times.
Electrical function test
Activate the rope pull system by means of the RESET actuating cylinder.
Start the installation/machine.
Actuate the pull rope / EMERGENCY STOP button: this results in the safety contacts opening immediately.
The safety contacts close only after renewed operation of the RESET actuating cylinder.