Setting up the basic unit, Start-up, Installing the heating bath – Heidolph Hei-VAP Advantage User Manual

Page 23: 3 setting up the basic unit, 4 start-up

Advertising
background image

Set-up and Start-up



Hei-VAP Value, Hei-VAP Advantage

15

EN

4. Switch off the unit.

5. Remove the plug.

6. Package the unit.

CAUTION

Vibrations and shocks!

Damaging the housing and the mechanical system of the equip-
ment.
 Avoid vibrations and shocks.


 Carry the basic unit from below.

4.3 Setting up the basic unit

Chemicals may reach the atmosphere (via the pump) when handling hazardous materi-
als and distilling solvents.

 Verify that harmful fumes or gases do not affect the operating personnel. The pump

exhaust air must be channeled to an exhaust hood or condensate condenser.

 Verify that the interior and exterior pressure variance equals no more than 2 bar.
 Verify that the emergency stop for the power supply is always easy to reach.

Avoid setting up the rotary evaporator in corrosive atmospheres.
This reduces the service life of the equipment.

CAUTION

Tilting the heating bath!

Damaging the housing and risk of injuries.
 Place the basic unit on a solid level surface with sufficient

room.


 Select a level, solid, and heat resistant surface.

4.4 Start-up

4.4.1

Installing the heating bath

 The basic unit is located on a suitable place.

Figure 4

–2: Heating bath

1

Heating bath

2

Base plate

Where?

Start-up
Installing the heat-
ing bath

2

1

Advertising
This manual is related to the following products: