1 operational test – INFICON XTC/C Thin Film Deposition Controller User Manual

Page 76

Advertising
background image

3 - 12

IP

N 07

4-

18

3X

XTC/C - XTC/2 Operating Manual

3.6.1 Operational Test

The power switch should be in the STBY position before the instrument is
connected to line power.

Perform the self test as follows:

1

Verify that no system cables other than the power cord are connected to the
unit. Relays may be verified with an ohm meter or custom test box.

2

Set configuration switch 1 to the "ON" position.

3

Press the ON/STBY switch, the green power LED should light. If Err is
displayed on the LCD, see

section 6.2 on page 6-1

.

4

The following LCD displays will appear:

TEST

READY

XX:XX PHASE MIN:SEC

XX% POWER

XTAL FAIL

5

Press the PROG key. The program display will appear and the cursor will
be located beside RISE TIME.

Advertising
This manual is related to the following products: