3.6.1 Operational Test
The power switch should be in the STBY position before the instrument is
connected to line power.
Perform the self test as follows:
1
Verify that no system cables other than the power cord are connected to the
unit. Relays may be verified with an ohm meter or custom test box.
2
Set configuration switch 1 to the "ON" position.
3
Press the ON/STBY switch, the green power LED should light. If Err is
displayed on the LCD, see
4
The following LCD displays will appear:
TEST
READY
XX:XX PHASE MIN:SEC
XX% POWER
XTAL FAIL
5
Press the PROG key. The program display will appear and the cursor will
be located beside RISE TIME.