Landoll SL/SLB/SLP/SLPB/SLPB TURFMAKER III User Manual

Page 30

Advertising
background image

2-20

1P124

ASSEMBLY INSTRUCTIONS

4.

Press the magnetic wheel onto the clutch shaft until it
is vertically centered with the pickup switch.

5.

Adjust the pickup switch and bracket so the
centerline of the magnet wheel and pick up switch
are horizontally and vertically aligned with maximum
1/8” between the magnet wheel and pick up switch.
Firmly tighten all screws.

NOTE

Alignment of the pickup switch and the magnet wheel is
critical. Improper alignment will cause the acre counter to
record acres erratically or not at all.

6.

Attach the short pickup switch ground wire to the
small hole in the 5K332 bracket with a #6-32 x 1/2”
machine screw, removing paint under the wire
connector to assure a good electrical ground
connection. See Figure 2-27.

7.

Route the wire from the acre meter down the front of
the seed box to the pickup switch and connect the
mating plugs.

8.

Securely fasten the wire to the seed box and
transmission drive using the adhesive mounting
bases and wire ties to prevent wire from becoming
entangled or rubbing moving parts.

9.

Program the acre counter. See Page 3-7.

Figure 2-27: Magnetic Wheel

Ground

Wire

1/8” Maximum

Side View

Top View

Pick Up Switch

Pick Up Switch

Magnet Wheel

Clutch Shaft

Advertising