6 commissioning, 1 before initial switch-on, Commissioning – Lenze E84AYCER User Manual
Page 34: Before initial switch-on
Advertising

E84AYCER communication manual (PROFINET)
Commissioning
Before initial switch-on
34
L
EDS84AYCER EN 2.0 - 11/2010
6
Commissioning
During commissioning, system-specific data such as motor paramters, operating
parameters, responses, and parameters for fieldbus communication are specified for the
controller. In the case of Lenze devices this is carried out via the so-called codes.
The controller and communication codes are saved non-volatilely as a data record in the
memory module.
In addition there are diagnostic and monitoring codes for the nodes.
6.1
Before initial switch-on
Stop!
Before switching on the standard device and the communication module for the
first time, check the entire wiring for completeness, short circuit and earth fault.