7 commissioning, Before switching on, Commissioning 40 – Lenze E94AYCET User Manual
Page 40
Advertising
![background image](/manuals/565762/40/background.png)
7
Commissioning
Before switching on
EDK94AYCET DE/EN/FR/ES/IT 5.0
40
l
H1inbet−LESE_INB_KHB E94AYCET
7
Commissioning
Before switching on
(
Stop!
Before switching on the standard device with the communication module for
the first time, check the entire wiring for completeness, short circuit and earth
fault.
,
E94AYCET (EtherCAT) communication manual
Here you’ll find some detailed information on commissioning the
communication module.