Mechanical installation
Preparation
Important notes
EN
10
Lenze ¯ MA 12.0015 ¯ 1.0
4.3
Preparation
)
Note!
Thoroughly remove anticorrosion agents from output shafts and flange
faces.
4.4
Mounting
4.4.1
Important notes
(
Stop!
Shocks and impacts on the shaft damage the roller bearings.
4.5
Electrical connection
{
Danger!
Electrical connections must only be carried out by skilled personnel!
)
Note!
The notes for the electrical connection can be found in...
¯ in the terminal box (in case of motors with terminal box).