Commissioning and operation

Important notes

5

EN

11

Lenze ¯ MA 12.0015 ¯ 1.0

5

Commissioning and operation

5.1

Important notes

(

Stop!

The drive may only be commissioned by skilled personnel!

¯

Take safety measures prior to any operation:

Disconnect the machine from the mains, ensure standstill of the drive system
and avoid any machine movement.

5.2

Before switching on

Please check:

¯

Drive function - machine function assignment

¯

The direction of rotation of the drive shaft

g700 with servo motor

¯

Does the drive appear undamaged?

¯

Is the mechanical fixing o.k.?

¯

Is the electrical connection correct?

¯

Are all rotating parts and surfaces that may become hot protected against
contact?

5.3

During operation

During operation, check the drive periodically and take special care of:

¯

changes compared to normal operation, like

unusual noise, stronger vibrations or increased temperatures,

leakages,

loose fixing elements,

the condition of the electrical cables.

¯

In case of faults:

shut down the drive,

check the troubleshooting table.

If the fault cannot be remedied, please contact the Lenze customer service.