Mechanical installation – Lenze E82ZBU User Manual

Page 8

Advertising
background image

Mechanical installation

EDK82ZBU DE/EN/FR 4.0

8

l

H1_MechINS−inst_mech_en

2

Mechanical installation

The switch/potentiometer unit can be mounted to the heatsink of a motec or a wall.

Mounting to the heatsink of a motec

0

1. Mount the mounting plate with 2 screws M4 x 20 and 2 spring steel sheets

0 to the

heat sink.

2. Wire the switch/potentiometer unit

– to the standard−I/O

^ 9

– to the application−I/O

^ 10

3. Assemble the motec (

^ Mounting Instructions for motec

)

4. Mount the switch/potentiometer unit with 4 screws M4 x 30

1to the mounting

plate.

Wall mounting

1. Mount the mounting plate to the wall using appropriate screws.
2. Mount the switch/potentiometer unit with 4 screws M4 x 30 to the mounting plate.
3. Wire the switch/potentiometer unit

– to the Standard−I/O

^ 9

– to the Application−I/O

^ 10

4. Assemble the motec (

^ Mounting Instructions for motec

)

Advertising