Electrical installation, Wiring with standard-i/o – Lenze E82ZBU User Manual

Page 9

Advertising
background image

Electrical installation

Wiring with Standard−I/O

EDK82ZBU DE/EN/FR 4.0

9

l

H1_E_INST−beisp_en

3

Electrical installation

Wiring with Standard−I/O

Setpoint selection through potentiometer and reversal of direction of rotation through
switch

Description of the functionality
ƒ Deceleration after STOP along the quick stop ramp (C0105).
ƒ Deceleration and acceleration after a reversal of the direction of rotation along

ramps C0013 and C0012.

For this, the following is required:
1. Connect the switch/potentiometer unit to the Standard−I/O.
2. Configure hardware and software of the motec for a setpoint range of 0 ... 5 V:

– Adapt the switch position at the function module.
– Adapt C0034.

3. Configure two digital inputs with the signals CW/QSP and CCW/QSP

Example for terminal configuration C0007 = −16−

8 9

X3

>100k

10k

7 20 28 E1 E2 E3 E4 39 A1 59

7

62

GND1

+5V



1 = CW

2 = CCW

0

‚

‚

0

2

1

min

max

E82ZBU02



Switch/potentiometer unit

‚

Wire bridges

Wiring for setpoint selection through potentiometer

Wiring for reversal of direction of rotation through switch

CW

CW rotation

CCW

CCW rotation

Setpoint selection

Change of direction of rotation

Terminal assignment

X3/8

White wire

X3/20

Yellow wire
DC supply +20 V
Wire bridge to X3/28

Controller inhibit" (CINH)

X3/9

Green wire

X3/E3

Grey wire = CW rotation
(CW/QSP on X3/E3)

X3/7

Brown wire

X3/E4

Pink wire = CCW rotation
(CCW/QSP on X3/E4)

Switch position

1

2

3

4

5

OFF

OFF

ON

OFF

OFF

Parameter setting

C0034 = −0−

C0007 = −16−

Advertising