3 mechanical installation, 1 attaching operating unit, Mechanical installation – Lenze EPM-H312 User Manual

Page 46: Attaching operating unit, 3mechanical installation, Tighten the screws  against the mounting board

Advertising
background image

Mechanical installation

Attaching operating unit

3



46

EDBPM-H312 DE/EN/FR 2.0

3

Mechanical installation

3.1

Attaching operating unit
The dimensions for the mounting cutout can be found in the ”Technical data”

(Q 45)

1. Insert operator terminal  with gasket  into

the mounting cutout.

0

1

H312_005

2. Insert mounting clamps  into the slots at the

operating unit.

0 VD

C

N.C

.

LCD

ADJ

+24

VDC

INP

UT:

18

- 32

V

5W

FUS

E

315

mA

ASP

8

N.C.

CAN+

Shield

CAN-

V-

1

2

3

4

5

2

1

3
4

2

2

H312_006

3. Tighten the screws  against the mounting

board.

0 VD

C

N.C

.

LCD

ADJ

+24

VDC

INP

UT:

18

- 32

V

5W

FUS

E

315

mA

ASP

8

N.C.

CAN+

Shield

CAN-

V-

1

2

3

4

5

2

1

3
4

3

3

H312_007

Advertising