4 electrical installation, 1 assignment of the terminals, Electrical installation – Lenze EPM-H312 User Manual

Page 47: Assignment of the terminals, 4electrical installation, Stop

Advertising
background image

Electrical installation

Assignment of the terminals

4



47

EDBPM-H312 DE/EN/FR 2.0

4

Electrical installation

4.1

Assignment of the terminals



Stop!

ƒ

Damage of units connected. Connect the PE conductor as shown in

the figure!

ƒ

Wire the operating unit only when no voltage is applied!

LCD ADJ

+24 VDC

INPUT: 18 - 32 V 5W

FUSE

315 mA

0 VDC
N.C.

ASP8

N.C.

CAN+

Shield

CAN-

V-

1

1 2 3 4 5

2
3
4

PE

N

L1

CAN-GND

CAN-LO

CAN-HI

~

+18…32VDC

h312_008

Fig.4-1

Assignment of the terminals

DC supply voltage

Terminal

Identification

Explanation

1

DC +24 V

Supply voltage (DC +18 V ... 32 V)

2

DC 0 V

GND supply voltage, reference potential

3

n.c.

not connected

4

PE potential

System bus (CAN)

Terminal

Identification

Explanation

1

V-

GND

Reference potential

2

CAN-

LO

System bus LOW (data line)

3

Shield

Apply shield of the system bus cable

4

CAN+

HI

System bus HIGH (data line)

5

n.c.

not connected

Advertising