2 project download, 3 disconnecting from the pc, Project download – Lenze EPM-H312 User Manual

Page 51: Disconnecting from the pc, Commissioning

Advertising
background image

Commissioning

Project transfer to the operating unit

Project download

5



51

EDBPM-H312 DE/EN/FR 2.0

5.2.2

Project download

Note!

In the »HMI Designer«, you can select whether you want to update the

firmware at the time the project is loaded.
The firmware must always be updated with the first download of a

project to the operating unit or after an update of the »HMI Designer«

planning tool.

X

Tip!

Sample projects for the operating unit can be found in the

»HMI Designer« planning tool under File  Open...  Samples.

What to do
A

Switch on the PC and start the »HMI

Designer« planning tool.

B

Keep the enter key  of the operating unit

pressed.

F1

F2

F3

shift

Enter

Help

Esc

F4

0

Switch on the supply voltage for the

operating unit.

F1

F2

F3

shift

Enter

Help

Esc

F4

0

Let go of the enter key  when ”H312

Service Page” appears on the display.

F1

F2

F3

shift

Enter

Help

Esc

F4

0

C

Transfer the desired project from the »HMI

Designer« into the operating unit.

F1

F2

F3

shift

Enter

Help

Esc

F4

0

E

HMI Designer - Getting started”

F1

F2

F3

shift

Enter

Help

Esc

F4

0

D

After download is completed, the operating unit is ready for operation and can exchange data

with the connected nodes by the system bus. The project is stored after disconnection from the

supply voltage.

5.2.3

Disconnecting from the PC
1. Switch off PC.

2. Switch off supply voltage for operating unit.

3. Remove programming adapter EPZ-H111 on the operating unit and the

download cable EPZ-H110 from PC.

4. Switch on supply voltage for operating unit.
The operating unit is ready for operation.