2 project transfer to the operating unit, 1 connecting operating unit and pc, Project transfer to the operating unit – Lenze EPM-H312 User Manual
Page 50: Connecting operating unit and pc, Commissioning, Stop
Advertising
![background image](/manuals/566094/50/background.png)
Commissioning
Project transfer to the operating unit
Connecting operating unit and PC
5
50
EDBPM-H312 DE/EN/FR 2.0
5.2
Project transfer to the operating unit
5.2.1
Connecting operating unit and PC
Stop!
Only connect PC and operating unit when the units are switched off!
l
HMI Designer
LCD ADJ
+24 VDC
INPUT: 18 - 32 V 5W
FUSE
315 mA
0 VDC
N.C.
ASP8
N.C.
CAN+
Shield
CAN-
V-
1
1 2 3 4 5
2
3
4
0
1
2
h312_010
Fig.5-1
Connecting operating unit and PC
ƒ
Plug programming adapter EPZ-H111 onto interface ASP8 at operating unit.
ƒ
Connect download cable EPZ-H110 to programming adapter EPZ-H111 .
ƒ
Plug download cable EPZ-H110 onto COM1 or COMx at PC.