Commissioning
Initial switch−on
5
l
59
EDBPM−H315 DE/EN/FR 7.1
5
Commissioning
5.1
Initial switch−on
Commissioning requires a complete wiring of the system bus.
Before switching on the supply voltage, check ...
ƒ
the complete wiring for completeness and short circuit,
ƒ
whether the bus system is terminated at the first and last physical node.