Commissioning

Project transfer to the operating unit
Connecting operating unit and PC

5

l

60

EDBPM−H315 DE/EN/FR 7.1

5.2

Project transfer to the operating unit

5.2.1

Connecting operating unit and PC

(

Stop!

Only connect PC and operating unit when the units are switched off!

l

HMI Designer

1 0

2

INPUT VOLTAGE: 18-32VDC 15W
FUSE 800mA

LCD adj.

1

2

3

N.C. 24VDC

4

ASP8

N.C.

CAN+

Shield

CAN-

V-

1 2 3 4 5

h315_005

Fig. 5−1

Connecting operating unit and PC

1. Plug the programming adapter EPZ−H111

0

onto the ASP8 interface.

2. Connect download cable EPZ−H110

1

to programming adapter EPZ−H111

0

.

3. Plug download cable EPZ−H110

1

onto COM1 or COMx

2

at PC.