Project transfer to the operating unit, Connecting operating unit and pc, Commissioning – Lenze EPM−H315 User Manual
Page 60: Stop
Advertising
![background image](/manuals/566103/60/background.png)
Commissioning
Project transfer to the operating unit
Connecting operating unit and PC
l
60
EDBPM−H315 DE/EN/FR 7.1
5.2
Project transfer to the operating unit
5.2.1
Connecting operating unit and PC
(
Stop!
Only connect PC and operating unit when the units are switched off!
l
HMI Designer
1 0
2
INPUT VOLTAGE: 18-32VDC 15W
FUSE 800mA
LCD adj.
1
2
3
N.C. 24VDC
4
ASP8
N.C.
CAN+
Shield
CAN-
V-
1 2 3 4 5
h315_005
Fig. 5−1
Connecting operating unit and PC
1. Plug the programming adapter EPZ−H111
0
onto the ASP8 interface.
2. Connect download cable EPZ−H110
1
to programming adapter EPZ−H111
0
.
3. Plug download cable EPZ−H110
1
onto COM1 or COMx
2
at PC.