Setup, adjustment and operation, Setup, Pre-start inspection – MK Diamond MK-101 Tracker User Manual

Page 15: Connecting the water pump

Advertising
background image

MK-101 TRACKER

Revision 06/05, Effective Date June 07, 2005

Page 15

SETUP, ADJUSTMENT and OPERATION

SETUP:

1. Pre-start Inspection:

Prior to beginning work, a pre-start inspection of the saw should be performed.







































2. Connecting the Water Pump:

1.

To prevent the possibility electrical shock, the MK-101 TRACKER MUST be de-energized when
connecting the Water Pump.

2.

To prevent the possibility of electrical shock, use only MK Diamond qualified replacement parts

NOTE: To prevent pump damage, the Water Pump must be disconnected if cutting with a Dry Blade.




















(A)

Ensure the ON/OFF Switch

is in the OFF position

(B)

Verify the Movable Cutting Table

moves freely

(C)

Inspect the Diamond Blade for

damage – verify the blade is

correct for the material being cut

(D)

Inspect the Pump Assembly

for damage – ensure the cord

is free of cracks or cuts

(E)

Inspect the MK-101 TRACKER

for damage – ensure the cord

is free of cracks or cuts

Inspect for cracks,

de-bonding, etc.

Verify ease of movement

(See Maintenance section

if problems exist)

Inspect for

damage

Inspect for

damage

Inspect for

cracks or cuts

Off

Position

(A)

Connect the Cooling Transfer

Tube to the inlet connection

of the Blade Guard

(B)

Connect the Water Pump power

cord to the connection found on

the back of the motor

Press on

Cooling

Transfer

Tube

Inlet

connection

Pump

Connection

ON/OFF

Switch

Advertising