B2.0 review and training – MTS Criterion 40 - Installation and Commissioning Plan User Manual
Page 12

Installation and Commissioning Plan
12
MTS Criterion
TM
Series 40
B2.0 REVIEW AND TRAINING
This introduction provides a brief overview of the supplied equipment. It is not
intended as a substitute for formal training. MTS strongly recommends formal
classroom training at the MTS facility in hardware and software operation and
maintenance.
Note: The customer shall supply specimens to be used during the system
introduction. Typically, FSEs are trained in the operation and setup of
MTS testing systems, but are not trained in the performance/procedure of
specific tests.
Item Description
Performed
On Site
B2.1 Loading
test
methods.
B2.2 Running
tests.
B2.3
Saving, naming, and exporting data.
B2.4 Printing
reports.
B2.5
Backing up and restoring data.
B2.6 Defining
function
-
Make simple changes to the test flow.
-
Configure inputs.
-
Use the formula builder to write simple results
formulas.