C3.0 custom method development (purchased option) – MTS Criterion 40 - Installation and Commissioning Plan User Manual

Page 14

Advertising
background image

Installation and Commissioning Plan


14

MTS Criterion

TM

Series 40

C3.0 CUSTOM METHOD DEVELOPMENT (purchased option)

Item Description

Performed

On Site

C3.1

Develop method.

C3.2

Run and verify proper test operation.

C3.3

Demonstrate test method execution.

C3.4

Custom method edits or modifications:

• Adding or deleting hardware or software channels

• Adding or deleting calculations to a method

• Deleting inputs or input categories
• Using new inputs in an existing calculation

• Modifying an existing calculation

• Adding or deleting a configuration item in Define
• Modifying or creating new report or export

templates

• Adding/inserting or deleting new or existing test

segments

• Modifying the Data Collection tab of new or

existing test segments

C4.0 ON-SITE COMPUTER INTEGRATION (purchased option)

Item Description

Performed

On Site

C4.1

Load customer-supplied drivers for USB2 interface

hardware.

C4.2

Install MTS-supplied multi-channel hardware in PC if

purchased. (Purchased Option)

C4.3

Install testing software.

C4.4

Define and/or load system hardware parameters.

C4.5

Verify computer interface with MTS controller.

Advertising