MTS Criterion 40 - Installation and Commissioning Plan User Manual
Page 9

Installation and Commissioning Plan
MTS Criterion
TM
Series 40
9
Item Description
Performed
On Site
A3.3
Additional Purchased Options:
-
Calibrations: See section C1.0 if purchased.
-
System performance demonstrations: See section
C2.0 if purchased.
-
Custom test method creation: See section C3.0 if
purchased.
-
On-site computer integration: See section C4.0 if
purchased. On-site computer integration does not
include peripheral or network integration. If time
permits at the end of the installation, the FSE will
assist your Information Services Technician with
the integration of peripherals and network
capabilities. The FSE is not trained in information
systems troubleshooting techniques and is not
responsible for compatibility issues regarding the
integration of devices other than those required for
communication with the MTS-supplied controller.