Make connections, bleed lifts, tighten columns – MTS Series 322 Load Frames User Manual

Page 48

Advertising
background image

Series 322 Load Unit

48

Make Connections, Bleed Lifts, Tighten Columns

Installation

Make Connections, Bleed Lifts, Tighten Columns

1. Make all hydraulic and electrical connections to the load unit.

Air trapped in the lifts may let the crosshead drop as soon as you unlock it.

You can be hurt and your load unit damaged.

After installation, always bleed the lifts before unlocking the crosshead.

Hydraulic lock hoses

Force transducer cable

Emergency Stop cable

Pressure and return lines

Servovalve cable

Pilot pressure line

Lift cylinder lines

LVDT cable

Advertising