MTS Series 793 Controller User Manual

Page 95

Advertising
background image

Steps to Run a Test

MTS Series 793 Controller Overview

Perform a Practice Test

95

9. Start the test.

A. Ensure that the following are true:

Interlocks are cleared

High hydraulic pressure is applied to the station

Load tuning parameters are optimized

The test specimen is installed

Limits are set and actions are assigned

The test program is set up

The scope and meters are set up to monitor the test as desired

B. On the Station Controls panel, press the Program Run button to start

the test. When desired, press the Program Stop button to end the test.

10. Review test data.

A. Start the Project Manager application and select the current Project.

B. Click on the BTW folder to view the name of the associated data file.

C. Click on the data file to review its contents in the view pane.

Advertising