Transport option – MacDon Transport 30-36 ft and 39 ft 974 User Manual
Page 9
TRANSPORT OPTION
Form # 46581
Issue 11/04
8
SET-UP INSTRUCTIONS
16. Route header wiring harness as follows:
•
Route the harness from the outboard L/H
header leg up and through space between the
back sheet and the header back tube. Route the
harness with the lines along front of tube and
back into the inboard L/H header leg at (Z).
Attach ground wire (M) with 1/4 x 1/2 inch hex
head bolt and flange nut. Continue routing
harness through back tube to R/H end.
NOTE: Cable tie harness to existing hydraulic
lines running along the front of back tube.
•
Secure harness at the outboard L/H header
leg with harness clip at (P). Place other clips
for best appearance. Secure with cable tie at
(T), leaving 24” (610 mm) of harness from
bottom of header leg to connector. After
installing hitch for the first time, swing wheel
assembly to simulate 90º turns left and right.
Ensure adequate harness slack and install
cable ties at (W).
17. At the R/H end sheet, install lamp module and support as follows: For Single Sickle Headers, install at
(N) with the hardware that secures the sickle storage tube. For Double Sickle Headers, install at
clamp (V).
18. Connect header harness and end sheet harness to
lamp module. Route end sheet harness to top of end
sheet through hole at reel support arm anchor (S).
19. Install lights at R/H end sheet using the hardware that
secures the pivoting amber lights. Secure harness
with plastic tie at (R).
P
T
W
V
N
STEP 17: INSTALL LAMP MODULE – Double Sickle
STEP 17: INSTALL LAMP MODULE – Single Sickle
R
S
STEP 19: INSTALL LIGHTS AT END SHEET
STEP 16: ROUTE HEADER HARNESS
M
Z