Figure 8. lel and h, S detector outline and mounting dimensions – RKI Instruments Beacon 200 Rig Monitor, LEL/H2S User Manual

Page 21

Advertising
background image

Beacon 200 Rig Monitor Operator’s Manual • 16

2. Close and latch the housing door.

3. Position the monitor on a vertical surface at eye level (4 1/2 to 5 feet

from the floor).

4. The Rig Monitor is shipped with the mounting feet positioned behind the

housing. Loosen the screws that secure the feet to the housing, rotate
the feet to their mounting position (as shown in Figure 7), then tighten
the screws.

5. Insert 1/4 in. or 5/16 in. screws through the slots in the mounting feet at

each corner of the housing to secure the housing to the mounting
surface (see Figure 7).

6. Hang the LEL and H

2

S detector junction boxes using the mounting

brackets. Ensure that the detectors are facing down.

To Right

Cable

Bushing

Detector
Cable
Channel 2

1.50

Ø .75

14.2 Max

.75

To Left

Cable

Bushing

Detector
Cable
Channel 1

12 VDC

Battery

Cable

1.50

To Middle

Cable

Bushing

Ø .75

.75

12.2 Max

Figure 8. LEL and H

2

S Detector Outline and Mounting Dimensions

Advertising