Warning – Schwank ultraSchwank EIH User Manual

Page 39

Advertising
background image

39

UHE-F / EIH-F I&O Manual

IM100205

RD: MAY 2014

RL: 06A

WARNING

START UP ‘SMOKE’

During start up, material coatings used in the production process of tubes and reflectors will
“burn off” and create smoke during the first hour of operation. This is normal and temporary .
Please ensure that there is sufficient ventilation to adequately clear the smoke from the space.
Notify site and safety personnel to ensure that alarm systems are not unduly activated.

23. COMMISSIONING REPORT

INSTALLING CONTRACTOR: …………………………………………………………….

COMMISSIONING TECHNICIAN: ………………………………………………………..

ADDRESS: …………………………………………………………….

CITY: …………………………………………………………….

STATE/PROV: …………………………………………………………….

PHONE: …………………………………………………………….

CELL: …………………………………………………………….

DATE INSTALLED: ……………………………

PROJECT NAME: …………………………………………………………….

PROJECT CITY: …………………………………………………………….

HEATER MODEL #: …………………………………………………………….

HEATER SERIAL #: …………………………………………………………….

THIS APPLIANCE HAS BEEN FACTORY TESTED PRIOR TO SHIPMENT.

HOWEVER, IT IS NOT A “PLUG-IN” APPLIANCE AND REQUIRES FIELD ADJUSTMENT
AND COMMISSIONING TO ENSURE SAFE AND EFFICIENT OPERATION.

A QUALIFIED GAS SERVICE TECHNICIAN MUST COMMISSION THE APPLIANCE AND
COMPLETE THE COMMISSIONING REPORT.

CONFIRM THAT THE APPLIANCE IS INSTALLED ACCORDING TO ALL LOCAL AND NA-
TIONAL CODES AND THE INSTRUCTIONS IN THIS MANUAL.

ENSURE THAT SITE CONDITIONS MEET THE SPECIFICATIONS IN THIS MANUAL:

 SUSPENSION
 CLEARANCES TO COMBUSTIBLE MATERIAL
 VENTING AND AIR SUPPLY
 ELECTRICAL SUPPLY, WIRING, AND CONNECTION
 GAS CONNECTION, SUPPLY AND MANIFOLD PRESSURE

THIS COMMISSIONING REPORT MUST BE SUBMITTED TO OUR TECHNICAL SERVICES
DEPARTMENT PRIOR TO ANY CALL FOR TECHNICAL ASSISTANCE.

FAX THE COMPLETED REPORT TO 1-866-361-0523

Call Technical Services: 1-877-446-3727

Advertising
This manual is related to the following products: