Assembly / installation ..... continued – Schwank Parasol Series Post Mount 24 volt User Manual

Page 11

Advertising
background image

4BN/L6-24,4SN/L5 -24 Manual

IM100310

RD: MAR, 2010

RL: 1A - BA

11

ASSEMBLY / INSTALLATION ..... CONTINUED

8. Reflector Assembly to Burner:

6. Make gas connection, installing a union and 1/8” NPT plugged tap for pressure testing (both

field supplied) between gas supply and the gas hose

7. Connect 24Vac power supply to wires from burner - tuck wiring inside post

Check that the post and the burner assembly stand vertically plumb.
Make sure all bolts and nuts are tightened.
Ensure all gas connection is sound and the installation conforms to local and national codes.
Perform leak testing of all gas connections (see page 12)
Ensure electrical supply and connection to local and national codes.

Setup is now complete.

8. Install Reflector:
 Install a washer onto each wing bolt

 Align holes in reflector to those in the brackets

at top of burner

 Secure reflector to burner with wing bolts.

Advertising