Procedure for bottom unit – Rockwell Automation 1500 DeviceNet MV Controllers Installation Instructions User Manual
Page 31

Filling a Prepared Space in a Medium Voltage Controller Line-up with DeviceNet
8-3
1500-IN057
C-EN-P – June 2013
Figure 8.3 – Typical Starter Kit LV Panel for DeviceNet (lower unit of 2-High)
Procedure for Bottom Unit
Note:
This procedure does not require the top unit to be temporarily
disconnected from DeviceNet.
The prepared space does not have any DeviceNet connections or any
DeviceNet wiring entering or crossing the unit.
The vertical flat cable assembly on the low voltage panel of the kit has a
port to which a round cable is connected. The round cable is provided
with a 5-terminal connector on its loose end. Once the controller kit has
been installed, the DeviceNet connections may be completed. Connect
the loose end of the round cable to the bottom port of the upper low
voltage panel. If a device is already connected to the lower port of the
upper panel, a splitter or ―Y‖ connector (part number 40122-304-51)
must be inserted into this port to accommodate the cable connection to
the lower low voltage panel.