Chapter 1 - commissioning your 1394 sercos system, Chapter objectives, Chapter 1 – Rockwell Automation 1394 SERCOS Interface Multi-Axis Motion Control System User Manual
Page 9: Commissioning your 1394 sercos interface system, Chapter objectives -1, Chapter

1
Publication 1394-IN024B-EN-P — February 2004
Chapter
1
Commissioning Your 1394 SERCOS Interface
System
Chapter Objectives
This chapter provides you with the information to set up, configure,
and apply power to your 1394 system. This chapter includes:
•
•
•
Locating System Module Connectors and Indicators
•
Locating Axis Module Connectors and Indicators
•
Locating SERCOS Interface Fiber-Optic Connectors
•
Configuring Your 1394 SERCOS interface System
•
Configuring Your Logix SERCOS interface Module
•
Applying Power to the 1394 SERCOS interface System
•
These procedures assume you have completed mounting, wiring, and
connecting your 1394 system and Logix SERCOS interface module as
described in the 1394 SERCOS Interface Installation Manual
(publication 1394-IN002x-EN-P).
Note: Some of the procedures in this chapter include information
regarding integration with other products.