Install your armorblock cable base, Mount the cable base – Rockwell Automation 1792D-KPLT ArmorBlock MaXum Cable Base  User Manual

Page 5

Advertising
background image

ArmorBlock MaXum Robot I/O Cable Base and Kempf Box Plate 5

Publication

1792D-IN054B-EN-P - April 2003

Install Your ArmorBlock Cable Base

To install the cable base:

Mount the cable base

Attach the module to the base

Attach the cables

These procedures are explained in detail in the following sections.

Mount the Cable Base

The cable base can be mounted either vertically or horizontally, using
3 screws. Cable bases accommodate 4 or 8 point ArmorBlock MaXum
modules. You must allow additional space for installation of 8 point
ArmorBlock MaXum module, which are longer than 4 point modules.

43332

When
installing a
cable base
with an 8
connector
module,
allow for
the
additional
length.

1792D-CB23

1.34in
34mm

1.63in

41.5mm

6.10in

155mm

4 connector

module

8.23in

209mm

8 connector

module

1.90in

48.18mm

2.70in

68.5mm

1.42in
36mm

0.64in

16.25mm

0.26in

6.5mm

4.21in

107mm

2.27in

57.6mm

6.10in

155mm

1.35in

34.25mm

Advertising
This manual is related to the following products: