Required Tools and Equipment

medium blade screwdriver

programming equipment

appropriate network interface or cable

Install the SLC Processor

Make sure system power is off; then insert the processor into slot 0 of the 1746
chassis.

Cable Requirements

Network Interface

Processor

SLC 5/03

SLC 5/04

SLC 5/05

1747-UIC

X

(1)

(1)

requires 1747-C13 or 1747-CP3 cable

X

(4)

(4)

requires 1747-CP3 cable

X

(4)

1747-PIC

X

1747-CP3

X

X

X

1784-PKTX(D)

X

(2)

(2)

requires 1784-CP14 cable

X

1784-PCMK

X

(3)

(3)

requires 1784-PCM4 cable

X

(5)

(5)

requires 1784-PCM6 cable

10/100Base-T Ethernet

X

IMPORTANT

The SLC 500 modular processors must be inserted into the left slot (slot 0).
Inserting the processor in another slot won’t allow the processor to operate.

In addition, remove the protective wrap after installing the processor. Failure to
remove the wrap can cause the power supply to overheat.