Equipment required, Clearances, Equipment required clearances – Rockwell Automation 2707-M232P3xX, -M485P3X DTAM Micro Operator Interface Installation Instructions User Manual

Page 4

Advertising
background image

DTAM Micro Operator Interface

4

Other than the tools required to make the panel cutout, the tools
required for installation are:

7mm (M4) deep well socket wrench or nut driver

small slotted screwdriver

torque wrench (in. / lbs).

The terminal is tightened against the panel with six self-locking nuts.

Make sure that you leave adequate room, as shown in Figure 1, for
mounting, air flow, cabling, and access to DIP switches.

Figure 1
Recommended Clearances

Leave 3 inches (76.2 mm)

for Mounting, Air Flow, and

access to DIP Switches.

Leave 3 inches (76.2 mm) for

communications port connector.

Equipment Required

Clearances

Advertising