5 liquid-cooling connections, Side view top view front view – Rockwell Automation Liqui-Flo Trane Addendum User Manual

Page 22

Advertising
background image

3-6

Trane Liqui-Flo Addendum

3.5

Liquid-Cooling Connections

External coolant lines connect to the cabinet through two bulkhead fittings. The
bulkhead fittings are located on the rear panel of the cabinet as shown in figure 3.5.
Use the following steps to connect the coolant lines to the cabinet:

Step 1. Be sure the threads of the bulkhead fittings and the CenTraVac chiller’s

tubing connectors are free of dirt, burrs, and excessive nicks.

Step 2. Apply liquid sealer to the pipe thread end of the chiller’s tubing connectors.

Screw the connectors into the cabinet’s bulkhead fittings until they are
finger-tight. See figure 3.6.

Figure 3.4 – Cabinet Wire Routing Locations (12-Pulse Rectifier)

3-Phase AC

Volt Input to

Signal

Control

Wiring

3-Phase

AC Volts

Output to

Motor

Line Side

T3

T5

T1

T6

T2

T4

of Circuit

to Primary of

of Circuit Breaker

from Load Side

Volt Output

3-Phase AC

Delta-Wye

from Secondary of

Liqui-Flo Drive

3-Phase AC Volt

Input to C-Frame

Side View

Top View

Front View

Bulkhead

Coolant

2 Pl.

(0.875")

22.23 mm

(1.125")

28.58 mm

Cabinet Here

Wiring Enters

Signal Control

Ground Stud
Connections
(Left Side Wall)

Recommended, 3 Pl.

127.0 mm (5.0")

111.1 mm (4.38")
Recommended, 8 Pl.

Transformer

Delta-Wye Transformer

Fittings

Breaker

30A

10A

2A

15A

15A

(6 Places)

Advertising