Metrohm NIRS XDS Transmission OptiProbe Analyzer User Manual

Page 66

Advertising
background image

64

▪▪▪▪▪▪▪

Vision runs the Low Flux Test, which takes about 10 minutes. At the end, the results are displayed. A
typical run is shown:

Click on the tab marked “Summary” to see the summarized results as compared to acceptance
specifications. Vision reports a pass or fail based upon successful test completion.

Results are stored in the Diagnostic Database for later recall. The user may print results, or click
“Close” to complete the test.

Advertising