Metrohm 796 Titroprocessor User Manual

Page 122

Advertising
background image

7.8 MEAS

Extended measuring functions

796 Titroprocessor, Instructions for use

116

116

Time

Drift

Waiting period

Measurement drift

mV

Min

Sampling time

7.8.3 Multiple measurement

A multiple measurement consists of a series of drift or time-controlled indi-
vidual measurements. For the measurement acceptance of the individual
measurements the same parameters as for the above-mentioned standard
measurements are decisive. Each entry in the measuring point list is a
'smoothed' value.

The data recording parameters determine the measuring series run. The
number of measurement cycles and the measuring interval determine the
time taken for the series of measurements. The measuring interval defines
the time pattern at which the individual measurements are triggered. De-
pending on the type of measurement acceptance and the stability of the
measuring signal the time at which the measurement is entered into the
measuring point list may differ from the time pattern.
It is very important that the waiting period for the measurement acceptance
is selected to be shorter than the measuring interval, i.e. the waiting period
for the individual measurements should have safely elapsed when the next
measurement (according to the measuring interval) is started.

Time

Measured
value

Measuring interval

Tim
e

Drift

Measurement drift

mV
Min

Waiting period

Drift-controlled
measuring phase

Measurement
acceptance in
measuring
point list

Measuring interval

The various parameters of the MEAS modes are described in detail

on pages 171 to 177.

Time measurement is accepted
(if measurement drift or waiting
period has been fulfilled)

CM

= smoothed' measurement

Last entry in measuring
point list =

CM

First entry in

measuring point list

=

IM

Advertising