GBC 64C User Manual

Page 28

Advertising
background image

SPIRE II Series – Installation and Operating Instructions

Page 6-4

Figure 33. Separating film from the release liner.

5. Pull the laminate down, allowing it to drape over

the Upper Main Roller.
Ensure that the film is pulled evenly and that no
bulges exist at either end of the idler bar.

Figure 34. Pulling laminate film to Upper Main Roller.

6. Remove the Pressure Plate.

Refer to the “Removing the Pressure Plate”

7. Remove the Feed Table.

Refer to the “Feed Table” section.

WARNING: Removing the Feed Table exposes

moving parts. This means you can be harmed when
the Feed Table is removed. Make sure to install the
Feed Table when film loading is completed.

8. For the Lower media, guide the media around the

idler and up to the Main Rollers.

9. While pulling evenly, carefully align the edges of

the media with the laminating film, and press the
two together.
It is important that the tension is even from one
end of the supply rolls to the other.

Figure 35. Attaching mounting adhesive (on bottom)

to the PSA.

10. Lower the Upper Main Roller just enough to

make contact with the Bottom Main Roller.

Figure 36. Upper and lower films attached to each other.

11. Replace the Feed Table and Pressure Plate.
12. Press a threading card into the nip of the Main

Rollers, pushing the media into the nip.

Figure 37. Pressing a threading card into the nip.

13. Press the Footswitch and guide the film to the

Main Rollers.

14. Adjust the Rewinder tension so that the release

liner does not pull into the nip area.

15. Use the Upper and Lower Unwind Tension Knobs

to apply minimum braking to the shafts.

Advertising
This manual is related to the following products:

54C