Appendix 14: publication history, Ultra-cut 100 – Tweco 100 Ultra-Cut User Manual

Page 160

Advertising
background image

APPENDIX

A-40

Manual 0-4748

ULTRA-CUT 100

APPENDIX 14: PUBLICATION HISTORY

Cover Date

Rev

Change(s)

July 1, 2005

- -

First issue

Aug. 1, 2005

- -

Updated: CCM switch settings and coolant specs, added: static discharge warn-

ing, torch O-ring lubrication data, catalog numbers for RAS, torch valve, gas
control module, external power supply replacement parts, gas control box catalog
numbers.

Aug. 19, 2005

- -

Added: internal coolant filter cleaning, torch valve parts catalog numbers, metric

cut charts.

Sep. 2, 2005

- -

Modified warranty statement, corrected torch parts identification, added revision

history.

Sep. 30, 2005

- -

Added optional hose selection chart, corrected input power ratings, corrected
torch consumables selection charts.

Oct. 21, 2005

- -

Updated speed charts, updated fault chart, added voltages, added CCM info,

added 30A SS N2/H20 towater shield in torch sections.

Jan. 4, 2006

- -

Updated layout sketches to show new water lead between GCM-2010 and Torch
Valve. Updated GCM-2010 and Torch Valve to show new water lead. Added info
on routing input cables through bracket on lower back edge of power supply.
Updated grounding method for Remote Arc Starter Cover. Added marking data to
torch section. Updated Remote Arc Starter Schematic.

Jan. 28, 2006

- -

Updated gas specs chart, section 2.

Feb. 20, 2006

- -

Updated torch sections for 30A MS O2/O2 (new chart); 70A SS & AL, new part
numbers and charts; 100A SS & AL, new part numbers. Updated grounding data.
Updated shield cup installation art; added info on setting pre-charge pressure for
marking; updated schematic for GCM. Added system schematics.

Apr. 25, 2006

AA

In Section 8, updated 30A Aluminum N2/H20 speeds. Corrected minimum output

current to 10A. Added maximum input gas pressure. Added preflow gases to
gas applications chart. Added torch specifications. Changed ‘F1’ ground wire
size from 1/0 to #4. Added note, ‘side pressure can break check valves/connec-
tions to torch valve’. Added error code group 6, Non-recoverable fault, Contact
TDC for resolution’ (CCM software V2.3.1). Started using new cover styles.
Ref: ECO B-122.

Aug 25, 2006

AA.01 Added leads lengths C and D as part of ECO B122 missed earlier. Corrected art

pages 2-2, 3-2, 3-3, 6-2 and 6-3. inserted Gas Control Module diagram in Apdx 3.
Updated rev. to new version to include numbers.

Oct 10, 2006

AB.01 Added 400V, 400V CE and 600V inerter module part numbers.

Jan. 10, 2007

AC.01 Updated Error codes in section 4 and added notice to update to Firmware revision

2.4 or later. Updated Gas Control PCB layout in the Appendix. Added CNC cable
shiel grounding.

Mar. 5, 2007

AD.01 Updated with new XTL TVA art and part numbers per ECOB356. Corrected

plasma and shield hose lengths to 4’ with new part numbers. Corrected art in
section 3 showing hookup of work leads, input power etc..

Mar. 8, 2007

AE.01 Corrected Switch setting errors pgs. 3-5, 3-6 and 3-7 for SW8-2.

Mar. 28, 2007

AF.01

Updated the Gas Requirement table in section 2.

July 10, 2007

AG.01 Added mounting dimensions for the GCM, RAS and the XTL TVA section 6.

Oct 15, 2007

AH

Removed ref. to deionizer parts per ECOB524 and updated new pump and motor
assemblies per ECOB444.

Oct. 29, 2007

AI

Added star grounding information ECOB653, updated o-ring number ECOB467

Advertising