07 connect work cable and pilot and negative leads, Ultra-cut 100 – Tweco 100 Ultra-Cut User Manual

Page 36

Advertising
background image

INSTALLATION

3-12

Manual No. 0-4748

ULTRA-CUT 100

3.07 Connect Work Cable and Pilot and Negative Leads

1. Pass the ends of the work cable and pilot and negative leads upward through the leads bracket at the

bottom edge of the rear panel, then through the openings in the connections cover support panel.

2. Refer to the illustration. Connect the leads as shown. Tighten securely. Do not overtighten.

CAUTION

The clear connections cover must remain in place.

PILO

T

WORK

TORCH

Connection Panel

AC INPUT

L1

L2

L3

Work Lead

Torch Lead - To Remote Arc Starter

Work

Torch

Lead Connection Detail

Connections Cover
Support Panel

Art # A-07660_AB

Connections Cover

Pilot

To Cutting Table

Leads Bracket

Pilot Lead -
To Remote Arc Starter

Advertising