Tweco XTTM-301 User Manual
Page 25
Advertising
Manual 0-4768
3-7
INSTALLATION
Secondary
Gas
Plasma (+)
Gas
Control Cable
Connector
Coolant
Supply (-)
CNC Control
Cable
RED Shield Wires
With Ring Lugs
Torch Leads
Shield Stud
(for INNER Shields)
GREEN / YELLOW Shield
Wires with Ring Lugs
Torch Leads
Shield Stud
(for OUTER Shields)
Coolant
Return
Art # A-07073
Torch
Bulkhead
Panel
Power
Supply
Chassis
Double-shielded Leads Connections
5. Carefully remove the torch leads through the rubber boot on the power supply front panel. Feed the control
cable connector through the boot last, as there will not be enough room for it to pass through the boot if the
other leads are in the boot.
Advertising