Tweco XTTM-301 User Manual
Page 35

Manual 0-4768
3-17
INSTALLATION
Shield ('Secondary')
Gas Connector
Coolant Supply Connector
Coolant Return
Check Valve
and Connector
Plasma Lead
Connector
Pilot Lead
Plasma Lead
Art # A-06258
Insulating Paper
Insulating Paper
2
Shown to illustrate
assembly order only;
parts must remain
secured tightly.
1
Positioning Tube
End Cap
O-Ring
O-Ring
Torch Leads
Threaded
Holes
Drain Holes
Positioning Tube
Detail
10. The lower end of the Mounting Tube includes four threaded holes. Install an Allen set screw from the hardware
kit in any of the threaded holes to secure the Torch Head Assembly to the Mounting Tube.
11. Fasten the positioning tube into the torch clamp. Slide the leads end cap down onto the torch positioning tube.
Ensure that the end cap engages the O-ring at the top of the positioning tube.
12. Install the shield cup, and cartridge assembly (including consumables) onto the torch head.