06 remote pendant installation, 06 remote pendant installation -8, N7500 assembly and installation – Tweco N7500 User Manual

Page 34: Ok tr v jo g stop, Roug h star t, 5 am p 5 am p, Control box (viewed from cabinet right side)

Advertising
background image

N7500

ASSEMBLY AND INSTALLATION

ASSEMBLY AND INSTALLATION

4-8

Manual 89250890

4.06 Remote Pendant Installation

Make the following connections from the Pendant to the Control Box. See "Figure 4-12: Assembly Stage 3".

(Rear panel assembly

not shown for clarity)

N7500 Gouging Syste

m

Automatic Contro

l

anel assembly

n for clarity

REMOTE PENDANT

REMOTE PENDANT CABLE

OK

TR

V

JO

G

STOP

T

UNE

ROUG

H

STAR

T

MOTOR CABLE -

CONTROL BOX TO

TORCH HEAD

AIR HOSE

DC POWER

CABLE (+) OUT

TORCH HEAD

GROUND CABLE (–)

DC POWER CABLE (+) IN

INCOMING

AIR LINE

POWER

SUPPLY

TORCH HEAD

PENDANT

AIR OUT

MOUNTING

FIXTURE

AIR INLET

ART# A-10854_AB

POWER SUPPLY

COMMUNICATION CABLE

AIR REGULATOR

OU

5 AM

P

5 AM

P

WORK PIECE

SIGNAL

WIRE

GROUND CABLE (–)

CONTROL BOX INPUT

AC POWER CABLE

CONTROL BOX

(VIEWED FROM CABINET RIGHT SIDE)

120V

OR

220V

THESE CONNECTIONS

ON OTHER SIDE

S

Figure 4-12: Assembly Stage 3

14. Connect the Remote Pendant Cable Assembly to the Remote Pendant and the Control Box. Cable has a

large 7 pin connector at each end. Refer to "Table 4-7: Cable Identification" on page 4-3.

15. Plug the travel system grounded power cord into the receptacle labeled “POWER OUTLET”.

WARNING

Select the receptacle voltage that correctly matches the plug and power requirements of the Carriage

System.

Advertising