Refer to Figure 3-1:
1. Connect end of ground (GREEN or GREEN/YELLOW) conductor to a suitable ground. Use a grounding method

that complies with all applicable electrical codes.

2. Connect ends of line 1 (BLACK) and line 2 (WHITE) input conductors to a de-energized line disconnect switch.
3. Use Table 3-1 as a guide to select line fuses for the disconnect switch.

Input Voltage

Fuse Size

115V

30 Amps

Table 3-1: Fuse Guide

Figure 3-1: Electrical Input Connections

CAUTION

The time-delay fuses or circuit breaker of an individual branch circuit may have nuisance tripping when

welding with this product due to the amperage rating of the time-delay fuses or circuit breaker.
The recommended time-delay fuses or circuit breaker size is 30 amperes. Fuse/circuit breaker size is based

on not more than 200 percent of the rated input amperage of the welding power source (Based on Article

630, National Electrical Code).
An individual branch circuit capable of carrying 30 amperes and time-delay fuses or circuit breaker protec-

tion is recommended for this application.