07 lift tig (gtaw) setup, Lift tig (gtaw) setup -7, Installation thermal arc 95 s – Tweco 95 S Thermal Arc(Jan2013) User Manual

Page 25

Advertising
background image

INSTALLATION

THERMAL ARC 95 S

Installation 3-7

Manual 0-5086

3.07 Lift TIG (GTAW) Setup

Figure 3-3: Setup for Lift TIG (GTAW) Welding

Lift TIG Sequence of Operation

CAUTION

Before any welding is to begin, be sure to wear all ap-

propriate and recommended safety equipment.

1. Switch the ON/OFF Switch (located on the rear panel)

to OFF.

2. Connect the ground clamp cable to positive output

terminal, and the TIG torch cable to the negative output

terminal.

NOTE

This set up is known as Straight Polarity or DC Electrode

Negative. This is commonly used for DC TIG welding on

most materials such as steel and stainless steel.

3. Using a secured Argon cylinder, slowly crack open then

close the cylinder valve while standing off to the side

of the valve. This will remove any debris that may be

around the valve & regulator seat area.

4. Install the regulator and tighten with a wrench.
5. Connect the gas hose to the outlet of the Argon

regulator, and tighten with a wrench.

6. Be sure the gas valve on the torch is closed, and

slowly open the Argon Cylinder Valve to the fully open

position.

7. Connect the ground clamp to your work piece.
8. Plug the power cable into the appropriate outlet, and

turn the switch to the “ON” position. The power L.E.D.

light should illuminate.

Set Process Selection

Switch to GTAW (Lift TIG).

Positive Output

Terminal

(Dinse™ 25)

Negative

Output

Terminal

(Dinse™ 25)

Art #: A-08603_AC

Set Welding Current

as specified by the

Electrode Manufacturer.

Secure the gas cylinder in an

upright position by chaining it

to a stationary support to prevent

falling or tipping.

Advertising