Installing and purging the gas regulator – VICI D-2-I User Manual

Page 19

Advertising
background image

15

Installing and Purging the Gas Regulator

1. Make sure the on/off valve on the helium cylinder is completely closed.

Screw the CGA fitting nut of the regulator into the helium cylinder. Go
beyond finger-tight, but do not tighten the nut all the way – some leakage
is required for the purging operation.

2. Turn the output pressure regulating knob completely counterclockwise.

3. Open the cylinder on/off valve slightly and quickly close it again.

4. Adjust the tightness of the regulator connecting nut to allow a pressure

reduction of ~690 kPa/sec (100 psi/sec). With a new bottle, the gauge
should start out at about 14 MPa (2000 psi).

5. When the pressure drops into the 1.4 - 3.4 MPa (200 - 500 psi) range,

open the cylinder on/off valve slightly and quickly close it again.

6. Repeat Step 5 eight or ten times to be certain that all the air is purged.

On the final purge, tighten the regulator connecting nut very securely as
the pressure approaches the 2.1 - 3.4 MPa (300 - 500 psi) range.

7. Open the cylinder valve to pressurize the regulator once again. Close

the valve and observe the needle of the high pressure gauge for 15 minutes.
If it doesn’t move, there is no critical leak on the high pressure side of the
regulator.

CAUTION: Never use leak detecting fluids on any part of
this system.

Installation

GAS CHROMATOGRAPH

COLUMN

INJECTOR

TEE

(ZT1)

HELIUM

PURIFIER

DISCHARGE GAS

(99.999% He)

TGA-R-50F50P

RESTRICTOR

(50 mL/min minimum)

VENT

COLUMN INLET

DISCHARGE GAS

INLET

Figure 4: Gas connections for a PD-D2-IS system

Advertising
This manual is related to the following products:

D-2