SETTING UP THE WATERLINK

®

3 EXPRESS LAB

SETTING UP THE COLORIMETER LAB FOR THE

CHLORINE AND BROMINE SERIES

The Chlorine and Bromine Series use Unit Dose Vial (UDV) reagents. The

powder reagents are packaged single test amounts in square plastic vials

with foil tops. The UDV chamber adapter, which is shipped in the meter

chamber, is used with these reagent systems. (The Other Series uses

various forms of reagent systems. The reactions are read in a round glass

tube and the UDV adapter must be removed from the meter chamber)

COLORIMETER

Remove the colorimeter and USB cable from the box. Save this box for

1.

shipping purposes if needed in the future.
If using the meter as an in-store water analysis lab, use the USB

2.

connector cable. The colorimeter must be connected to the computer

by the USB cable to transfer data to the DataMate™ PC software

program.

METER SET UP WITH DATAMATE SOFTWARE

Follow this procedure to send data from the Waterlink 3 Express colorimeter

into the DataMate software program.

Turn the WaterLink 3 Express Colorimeter OFF.

1.

Plug the USB cable mini connector into the back of the WaterLink 3

2.

Express Colorimeter.
Plug the larger USB cable type A connector into the computer USB

3.

port. The colorimeter will automatically turn ON once the USB cable is

connected to the computer and the colorimeter.
In the Programs section on your computer open the DataMate (Dmate)

4.

software program and click “Meter Setup” on the Home Screen.
In the DataMate Comport Setup Wizard window, select the WaterLink 3

5.

Express option, then click NEXT button.
The DataMate software program will now display “Meter Found”.

6.

Click “Finish” to save the settings.

7.

The WaterLink 3 Express colorimeter is now ready to transfer test

8.

results to the DataMate software program.

UNIT DOSE VIAL (UDV) RACKS

Remove the components of the white plastic racks from the packaging

1.

and attach the grid portion by flipping up the four sides from the base.
Do not add the middle grid. Only one grid is actually needed since this

2.

will allow the UDVs to slide into the rack more easily when filling.

9