Reel following rolling harrow (optional) – Great Plains 4000TT Predelivery Manual User Manual

Page 23

Advertising
background image

Great Plains Manufacturing, Inc.

Assembly

19

02/11/2014

586-201Q

Reel Following Rolling Harrow (optional)

Note: It is very important to install the reel assembly in

the order shown below and go to the rolling harrow
placement drawing, see “Layout Section” of this
manual for proper dimensions where it is marked
xxx in drawing below. The reel arm assemblies
dimensions are coming off of rear tube of drag

frame to side of plate of reel arm assemblies

.

The reel tube assemblies

are dimensioned off

of end of reel tube to side of plate on reel arm
assembly

(dimensions in layout drawings may

come off either end of tube). For complete parts
breakdown see “Attachment Section” of Parts
Manual.

Refer to Figure 16
66. Install mounting reel arm assemblies

in position

shown in reel following rolling harrow placement
drawing with 5/8 x 3 1/32 x 4 1/2 u-bolts

, 5/8 lock

washers and 5/8 nuts. Torque u-bolts to 150ft-lb.

67. Attach reel tube assemblies

in direction shown in

circle and place them in position shown (with arrow

towards machine) with 5/8 x 2 17/32 x 3 1/2 u-bolts

, secure with 5/8 lock washers and 5/8 nuts.

Torque u-bolts to 150ft-lb.

68. Check to see that all bolts have been tightened to

specs, See “Torque Values Chart” on page 23.

1

1

3

1

1

2

3

4

2

1

4

3

Figure 16

Reel Following Rolling Harrow

43236

Advertising