2s dd1161- check valve installation, These gauges are re-installed at step 60, Step 59. note which hose is which (b – Great Plains 3S-3000 Installation Instructions User Manual

Page 10

Advertising
background image

Great Plains Mfg., Inc.

10

Open Center Hydraulic Kit

194-149M

09/05/2012

2S DD1161- Check Valve Installation

Refer to Figure 11
53. Select two new:

811-636C AD 9/16MORB STRAIGHT UNION

Make sure the jam nut is fully threaded onto the
adaptor.

54. At the lower rear valve Port R of each pressure con-

trol valve

, screw in the union

end with the

integral hex nut (NOT the end with the jam nut).
Tighten to 9/16ORB specification.

55. Select two new:

810-343C VALVE PO CHECK 2:1 W/9/16FORB

Note: These valves are stamped

85050146

, and if

shaken gently, do not rattle.
(The third valve, assembled at step 62, is a shuttle
valve, and does rattle.)

56. Screw Port 2 of each check valve

onto the other

end of the adaptor

installed at step 54. Turn until

finger tight, then back off until the side of the valve
with the hex head cartridge is Up and Port 3 is
down. Tighten the jam nut to 9/16ORB specification.

57. Select two new:

811-439C TE 9/16MORB 9/16MJIC 9/16MJIC

This is the symmetrical MJIC/MORB tee. There are
four of these in the kit.

58. Screw the MORB port of the tee

into the rear

Port 1 of each check valve

. Screw until finger

tight, then back off until the JIC ports are vertical.
Tighten the ORB jam nut to 9/16ORB specification.

59. Locate the disconnected hoses:

811-587C HH3/8R1 092 9/16FJIC

At the lower port of each new tee

, reconnect the

hose

to the cylinder base ends that was discon-

nected at step 51. Do not use pipe thread sealant
on these or any JIC fittings. Tighten to 9/16JIC
specification (see page 21).

60. Select two new NPT swivel adaptors:

811-582C AD 9/16FJIC 1/4FNPT

and the saved gauges:

810-300C PRESSURE GAUGE 3000 PSI

Apply liquid pipe thread sealant to the gauge MNPT
threads and screw the adaptor

onto the gauge.

Tighten to 1/4NPT torque specification (see
page 21).

61. At each valve, screw the JIC end of the gauge

assembly

onto the top port of the new tee

.

Orient the gauge to face forward, and tighten the
JIC connection to JIC torque specification.

WING

CENTER

BASE END

, CENTER OPENERS

BASE END

, WING OPENERS

1200

120

0

600

600

0

0

3000

3000

1800

1800

2400

2400

psi

psi

ROD END

, CENTER OPENERS

ROD END

, WING OPENERS

P

G

T

R

1

2

3

R

G

P

T

1

3

2

2

3

1

P.O. CHECK

Figure 11

Install 2S DD1161- Check Valves

18761

23

23

52

52

16

16

61

61

20

20

22

51

U

D

F

B

L

R

22

51

53

23

52

23

16

16

23

20

20

16

61

20

61

22

51

22

22

20

Advertising