2s dd1162+ check valve installation, These gauges are re-installed at step 104, Step 102. note which hose is which (b – Great Plains 3S-3000 Installation Instructions User Manual

Page 16: Re-installed at step 100

Advertising
background image

Great Plains Mfg., Inc.

16

Open Center Hydraulic Kit

194-149M

09/05/2012

2S DD1162+ Check Valve Installation

Refer to Figure 18
94. Select two new:

811-636C AD 9/16MORB STRAIGHT UNION

Make sure the jam nut is fully threaded onto the
adaptor.

95. At the lower rear valve Port R of each pressure con-

trol valve

, screw in the union

end with the

integral hex nut (NOT the end with the jam nut).
Tighten to 9/16ORB specification.

96. Select two new:

810-343C VALVE PO CHECK 2:1 W/9/16FORB

Note: These valves are stamped

85050146

, and if

shaken gently, do not rattle.
(The third valve, assembled at step 106, is a shut-
tle valve, and does rattle.)

97. Screw Port 2 of each check valve

onto the other

end of the adaptor

installed at step 95. Turn until

finger tight, then back off until the side of the valve
with the hex head cartridge is Up and Port 3 is
down. Tighten the jam nut to 9/16ORB specification.

98. Select two new:

811-439C TE 9/16MORB 9/16MJIC 9/16MJIC

This is the symmetrical MJIC/MORB tee. There are
four of these in the kit.

99. Screw the MORB port of the tee

into the rear

Port 1 of each check valve

. Screw until finger

tight, then back off until the JIC ports are vertical.
Tighten the ORB jam nut to 9/16ORB specification.

100. Select the tee saved at step 92:

811-061C TE 9/16MJIC 9/16MJIC 9/16FJIC

Secure it to the bottom port of the tee

on the

right (Center) pressure control valve. Orient the side
port to face left. Do not use pipe thread sealant on
these or any JIC fittings. Tighten to 9/16JIC specifi-
cation (see page 21)

101. Locate the disconnected hose:

811-631C HH3/8R1 018 9/16FJIC

Connect the free end to the bottom port of tee

.

102. Locate the disconnected hose:

811-587C HH3/8R1 092 9/16FJIC

from the base end of the center cylinders.
Reconnect this hose

to bottom port of the tee

installed at step 100 on the right/Center valve.

103. Locate the disconnected hose:

811-587C HH3/8R1 092 9/16FJIC

from the base end of the wing (outer) cylinders.
Reconnect this hose

to bottom port of the tee

installed at step 98 at the left/Wing valve.

104. Select two new NPT swivel adaptors:

811-582C AD 9/16FJIC 1/4FNPT

and the saved gauges:

810-300C PRESSURE GAUGE 3000 PSI

Apply liquid pipe thread sealant to the gauge MNPT
threads and screw the adaptor

onto the gauge.

Tighten to 1/4NPT torque specification (see
page 21).

105. At each valve, screw the JIC end of the gauge

assembly

onto the top port of the new tee

.

Orient the gauge to face forward, and tighten the
JIC connection to JIC torque specification.

BASE END

, WING OPENERS

BASE END

, CENTER OPENERS

120

0

1200

600

600

0

0

3000

300

0

1800

1800

2400

2400

psi

psi

ROD END

, CENTER OPENERS

ROD END

, WING OPENERS

P

G

T

R

R

G

P

T

1

3

2

2

3

1

WING

CENTER

1

3

2

55

FigureSpacer

Figure 18

Install 2S DD1162+ Check Valves

27492

23

23

52

52

16

16

61

61

20

20

22

51

U

D

F

B

L

R

22

51

54

62

23

52

23

16

16

23

20

20

16

55

20

62

55

61

61

55

61

61

20

22

51

22

22

20

Advertising