2s dd1161- shuttle valve installation, 2s dd1161- shuttle valve hoses – Great Plains 3S-3000 Installation Instructions User Manual

Page 12

Advertising
background image

Great Plains Mfg., Inc.

12

Open Center Hydraulic Kit

194-149M

09/05/2012

2S DD1161- Shuttle Valve Installation

Refer to Figure 14
74. Select two sets of:

802-551C HHCS 1/4-20X2 1/4 GR5
804-075C WASHER FLAT 1/4 USS PLT
804-006C WASHER LOCK SPRING 1/4 PLT
803-006C NUT HEX 1/4-20 PLT

75. Place a flat washer

on each bolt

, and insert

the bolts through the top holes of the bulkhead

.

Place a lock washer

and nut

on the end of

the the threads. Spin the nut on just a few turns.

76. Select the shuttle valve

assembled at step 62.

With Port 1 to drill Right, place the valve against the
bulkhead

between the bolts

and under the

washers

. Tighten the nuts

to torque specifi-

cations.

2S DD1161- Shuttle Valve Hoses

Step 77 through step 82 re-connect the hoses discon-
nected at step 70.

Refer to Figure 15 on page 13
77. Identify the two existing 20in or 21in hoses

con-

nected to the top Ports P of the pressure control
valves.

Re-connect the other end of these hoses to the left
and right ports of the top tee assembly

at the

shuttle valve

Port 3.

78. Identify the 18in hose

connected to the rear Port

3 of the previously existing P.O.Check valve

.

Connect the free end of this hose to the forward fac-
ing port of the top tee assembly

at the shuttle

valve

Port 3.

79. Identify the two existing 18in hoses

connected to

the bottom Port T of each pressure control valves.

Re-connect the free end of these hoses to the lat-
eral ports of the right forward swivel tee

at the

shuttle valve

Port 1.

80. Identify the tractor circuit hoses

and

marked

at step 68.

81. Connect the “Lower” hose

to the rear port

of

the top tee at the shuttle valve

Port 3.

Note: If the drill is equipped with a filter, this is the hose

connected from the filter.

82. Connect the “Raise” hose

to the rear port

of

the right side tee at the shuttle valve

Port 1. This

port is not visible in the Figure.

83. Select two new:

811-531C HH1/4R2 018 9/16FJIC9/16MORB90

84. Connect the 90 degree ORB end of these hoses to

the bottom Port 3 of each check valve

.

85. Route the JIC end of each hose to the JIC ports of

the tee

at the left Port 2 of the shuttle valve

.

86. Tighten all hose connections to torque specifica-

tions.

87. Skip to “Closeout” on page 21.

3

2

1

FigureSpacer

Figure 14

Install 2S DD1161- Shuttle Valve

18774

12

U

D

F

B

L

R

4

15

13

14

17

12

15

14

13

15

12

4

14

13

17

4

12

15

13

57

5

17

62

53

5

17

62

6

17

58

59

58

7

17

59

8

17

21

16

18

17

Advertising