Hitch link, Make seed hose connections – Great Plains CTA4000 Operator Manual User Manual

Page 17

Advertising
background image

Preparation and Setup 13

08/03/2010

160-269M-A

Hitch Link

Refer to Figure 5,
which, for clarity, depicts the air cart without the rear hopper
1.

Use a line (not shown), from the cart walkboard, to
tie the cart links

up to the height of the lug holes

.

2.

Remove the pins

near the ball swivel links

of

the arms, allowing the arms to telescope. Do not
remove the stop bolts

.

3.

Drive the roll pins

out of the lug pins

and

remove the lug pins.

4.

Have a tractor slowly guide the cart backwards until
the link arm ball swivels are within two feet of the lug
holes

in the implement. Set tractor brake.

5.

Manually extend each arm’s ball swivel

into align-

ment with the implement pivot holes

. Insert and

secure the lug pins

on the implement.

6.

Slowly back the tractor up until the arm pins may
be reinserted. Secure them with clips.

7.

Set tractor parking brake and shut off tractor.

Make Seed Hose Connections

Refer to Figure 6
Connect primary seed hoses (tower feed hoses) from the
implement to their respective outlets on the rear cart
meter box, in left to right order, skipping any capped out-
lets.

Leave enough slack so that implement can be fully
raised, lowered, folded and unfolded.

Secure hoses to meter box using screw clamps provided.
Orient outer clamps so that they do not interfere with the
door latches on the meter.

6

7

5

7

1

3

Figure 5

Hitching Cart to Implement

26431

6

3

4

2

4

2

1

5

2

3

4

6

7

5

3

5

7

2

Figure 6

Cart Seed Hose Outlets

26302

Advertising