Frame level, Implement lift switch adjustment, Frame level implement lift switch adjustment – Great Plains CTA4000 Operator Manual User Manual

Page 38

Advertising
background image

34 CTA4000

160-269M-A

08/03/2010

Frame Level

Other than “Eyebolt Adjustment” on page 20, there is
no specific setup adjustment for leveling the wings to the
center section. When beginning planting, check frame
level with row units in level ground.

If one or both wings are angled up or down, check and
adjust the following items:

• opener sub-frame adjustment: all gauge wheel trun-

nions in same frame pivot holes - see “Opener-Sub-
frame Adjustment
” on page 39

• weight transfer setting - see “Adjusting Weight

Transfer” on page 36

• opener pivot height: all openers pivoting in same hole

at their mounts (possibly excepting rows in tire tracks)
- see page 41

• opener press wheel height: all row units set the same -

see page 44

• opener spring down-force: all row units set the same

(possibly excepting rows in tire tracks) - see page 41

Implement Lift Switch Adjustment

Refer to Figure 39
(which, for clarity, depicts the switch region without openers
or gauge wheel)
An implement lift switch on the implement turns seed
metering off when the implement is raised. To adjust the
height at which seed metering is turned off, follow these
steps:

1.

Do not place any part of body under implement while
making adjustments.

2.

Locate the implement lift switch

on the front center

of the mainframe.

3.

Raise openers completely and lock them up by set-
ting Transport/Field valve handle to TRANS.

4.

Loosen switch mount bolts

and slide switch up or

down until actuator

makes contact with the lift arm

and switch is reliably toggled on (up).

5.

Tighten bolts.

Note: Do not set the switch to come on too low. The lift

arm can ride up and down over irregular ground,
and an early switch could result in patches of no
seeding.

If eyebolt adjustment is changed (see page 20), re-check
implement lift switch.

Note: For reference, the ADC2350 lift switch wiring is:

Black (switch COM) to black (extension)
Red (switch N.C.) to red
Green (switch N.O.) not connected
Circuit open when drill is raised

Figure 39

Implement Lift Switch

26394

1

3

4

2

1

2

3

4